Kenwood Road Reconstruction

Madeira, Ohio

BCI designed the $4.5 million Kenwood Road Reconstruction Project for the City of Madeira.  This project included the complete reconstruction of the roadway.  In doing so, the project was able to add two bike lanes and a five-foot wide sidewalk.  The project was funded with a 50% match from the Ohio Public Works Commission.  Engineering services included surveying, design, construction administration and resident inspection services.

Kenwood-Road-2