Ronald Reagan Way

Sycamore Township, Ohio

The Towers of Kenwood Drive project is a $2.3 million roadway project which is designed to serve a 400,000 s.f. of office building, a new FBI regional headquarters, and a 400 room hotel.  BCI started work on this project in 2007 with a Traffic Impact Study.  The firm continued work on the project through the both the design phase and the construction administration and inspection phases.

The project was funded through a TIF Program specifically generated from the incremental taxes generated by the proposed development.  The Township maintained control over the project by funding and managing the design and construction.  The roadway and other improvements required coordination with multiple property owners, some of which had to maintain operations throughout the construction phase of the project.

The scope of the construction includes an underground detention system for stormwater control, underground utilities, a new water main, and sidewalks on the south side of the road for pedestrian access.  The new traffic signal will serve the intersection at Hosbrook Road and provide an efficient means of egress for the hotel and office users in the development.

Ronald-Reagan-Way-2